Week 1 of vacation done! In addition to sleeping late and drinking too much coffee, I made very good progress on the cabinets this week. First thing, I had to make some sawhorses, having none: Next, the skeleton of the cabinets: Pickles did not appreciate that I worked past her dinner hour that day. Getting everything level was a challenge, because the floor is not level -- it slopes front to back, and also left to right. Next, the backing for the cabinets. I used some leftover corrugated plastic so that the natural light from the windows can also light up the cabinets: Next, blocking large gaps in the back of the cabinets to keep mice and dust out. It was a lot of cutting tiny pieces of wood to fit odd-shaped holes, so it took a long time. For the gap under the framing that I'm attaching the cabinets to, I had this 15 foot board from the concrete pour last year that worked perfectly: Next, putting in plywood shelves: They go through only four of the cabinets, leaving the two on t...